+234 805 280 6928 Request a quotation

Quantity surveying documents for projects in Benin

Measured bills of quantities, material schedules and cost estimates for Benin projects, prepared remotely from your drawings and priced with a stated currency and date basis.

En français. Nous préparons des devis quantitatifs et estimatifs (BOQ), des états de matériaux et des estimations de coûts pour des projets situés au Bénin, à partir de vos plans. Les études sont réalisées à distance; les visites de chantier ne sont pas proposées au Bénin.

Benin's construction sector is closely tied to Nigeria's, both through trade and through the movement of materials across the Seme border. That connection means Nigerian rate data is a useful reference for Beninese projects, adjusted for the CFA franc, import duties and cross-border logistics.

We work remotely on Beninese projects, preparing measured BOQs, material schedules and cost estimates in French or English, from drawings supplied by the client or their architect.

What we can deliver for a project in Benin

Bill of quantities

Measured trade by trade from your drawings, priced in CFA franc (XOF) or issued blank for tender to local contractors.

Material schedule

Itemised quantities of blocks, cement, aggregates, roofing, finishes and services, staged so purchasing follows construction.

Cost estimate

Elemental cost plan with the rate basis, currency and date stated, and import or logistics costs shown separately.

Review of a bill prepared locally

An independent check on quantities and rates in documentation prepared by another party, before you tender or sign.

  • Documents travel; site attendance does notEverything above is prepared remotely from drawings and written information.
  • Currency and date basis statedCross-border trade with Nigeria makes Nigerian rate data a useful reference, adjusted for currency and import costs.
  • Local professional where neededWhere a project requires on-site presence in Benin, we will say so and not take the instruction.

Cities we receive enquiries from

Most enquiries from Benin relate to projects in or near Cotonou, Porto-Novo, Parakou, Abomey-Calavi. The location matters for the estimate, because material transport and labour rates vary between regions, so tell us where the site is even though the work is prepared remotely.

What to send

Architectural drawings in PDF or DWG, structural drawings if they exist, the site location, and the standard of finish intended.

What you receive

A measured document in editable and PDF form, with assumptions listed and the rate basis stated.

Turnaround

Typically 5 to 10 working days for a bill of quantities once complete drawings are received.

Questions from Benin

Do you attend sites in Benin?

No. Field-based attendance is offered in Nigeria only. For Benin we prepare documents remotely from drawings and written information, and we will say plainly when a project needs a local professional on site.

In what currency is a Benin project estimated?

Estimates are normally prepared in CFA franc (XOF), with the rate basis and the date of the rates stated. If you need the figure in naira, dollars or another currency for comparison, ask and we will show the conversion basis used.

Can you write the documents in French?

Deliverables can be issued in English and, where relevant, in French. State your requirement in the brief and the document will be written accordingly.

Send drawings for a Benin project

A written fee and delivery date, normally within 24 hours. Documents can be issued in English or French.

We read everything sent to info@peterch.org. Replies go out by WhatsApp — include a working number, with country code, in your first message.

Call now WhatsApp