+234 805 280 6928 Request a quotation

Quantity surveying services and how fees are set

Six services covering the two halves of the job: measuring and costing on paper, and inspecting and verifying on site.

How fees work

We do not publish a flat rate, because a flat rate would be either too high for a bungalow or ruinous for a hospital. Fees follow the work.

ServiceUsual fee basisTypical turnaround
Bill of quantitiesFixed fee per project, set by size, complexity and number of drawings5–10 working days
Material scheduleFixed fee per project3–7 working days
Cost estimate / cost planFixed fee, or included with a BOQ3–7 working days
Project verification / valuationFee per visit, or monthly retainer for ongoing projectsReport within 3 working days of visit
Field-based surveying (measured survey, snagging)Fee per attendance, plus travel quoted separatelyBy appointment
Contract or claim reviewFee per document, or hourly for complex matters3–5 working days

Travel is always shown separately. If a project is outside Greater Abuja you will see the transport, accommodation and time cost as its own line, so you can decide whether a visit is worth it. Grouping several sites into one trip usually reduces the figure.

Related services, and the limits that come with them

Three services we offer alongside quantity surveying, each with a statutory boundary stated openly rather than buried.

Read the caveats before you brief us. Property valuation for banks, courts and government is reserved by law to estate surveyors and valuers registered with ESVARBON. Survey plans and boundary determination are reserved to surveyors registered with SURCON. We do the measurement and costing around both, and we will tell you plainly when your job needs a different professional — before you pay us anything.

What every deliverable has in common

Measured, not estimated from area

Quantities come from reading and measuring the drawings, then checking the arithmetic. Area-based rules of thumb are used only where no drawings exist, and are labelled as such.

Priced in the open

Rates, waste allowances and assumptions are stated so a contractor or your own builder can challenge them line by line.

Editable and PDF

You receive a working spreadsheet you can send to tenderers plus a signed PDF for the record.

Dated and signed

Every report carries a date and is the work of a named person, not an anonymous template.

Written for the reader

Owner, contractor, lender and lawyer all get what they need without a decoder.

Independent

We are not selling materials, labour or construction. There is no incentive to inflate quantities.

Not sure which service you need?

Describe the situation in one or two sentences and we will tell you what is actually required, including if the answer is that you do not need us yet.

We read everything sent to info@peterch.org. Replies go out by WhatsApp — include a working number, with country code, in your first message.

Call now WhatsApp