+234 805 280 6928 Request a quotation

Quantity surveying documents for projects in Cameroon

Measured bills of quantities, material schedules and cost estimates for Cameroon projects, prepared remotely from your drawings and priced with a stated currency and date basis.

Cameroon operates a bilingual professional environment, with French and English both used in construction documentation. Douala and Yaoundé have active contracting markets, and material sourcing is heavily import-dependent, which ties construction cost closely to the exchange rate and to port logistics.

We prepare measured documents in either language, with the currency and rate date stated, and can review a bill of quantities prepared locally for accuracy.

What we can deliver for a project in Cameroon

Bill of quantities

Measured trade by trade from your drawings, priced in CFA franc (XAF) or issued blank for tender to local contractors.

Material schedule

Itemised quantities of blocks, cement, aggregates, roofing, finishes and services, staged so purchasing follows construction.

Cost estimate

Elemental cost plan with the rate basis, currency and date stated, and import or logistics costs shown separately.

Review of a bill prepared locally

An independent check on quantities and rates in documentation prepared by another party, before you tender or sign.

  • Documents travel; site attendance does notEverything above is prepared remotely from drawings and written information.
  • Currency and date basis statedBilingual documentation is normal in Cameroon, and deliverables can be issued in French or English.
  • Local professional where neededWhere a project requires on-site presence in Cameroon, we will say so and not take the instruction.

Cities we receive enquiries from

Most enquiries from Cameroon relate to projects in or near Douala, Yaoundé, Bafoussam, Garoua. The location matters for the estimate, because material transport and labour rates vary between regions, so tell us where the site is even though the work is prepared remotely.

What to send

Architectural drawings in PDF or DWG, structural drawings if they exist, the site location, and the standard of finish intended.

What you receive

A measured document in editable and PDF form, with assumptions listed and the rate basis stated.

Turnaround

Typically 5 to 10 working days for a bill of quantities once complete drawings are received.

Questions from Cameroon

Do you attend sites in Cameroon?

No. Field-based attendance is offered in Nigeria only. For Cameroon we prepare documents remotely from drawings and written information, and we will say plainly when a project needs a local professional on site.

In what currency is a Cameroon project estimated?

Estimates are normally prepared in CFA franc (XAF), with the rate basis and the date of the rates stated. If you need the figure in naira, dollars or another currency for comparison, ask and we will show the conversion basis used.

Can you write the documents in French and English?

Deliverables can be issued in English and, where relevant, in French. State your requirement in the brief and the document will be written accordingly.

Send drawings for a Cameroon project

A written fee and delivery date, normally within 24 hours. Documents can be issued in English or French.

We read everything sent to info@peterch.org. Replies go out by WhatsApp — include a working number, with country code, in your first message.

Call now WhatsApp