Quantity surveying documents for projects in Guinea
Measured bills of quantities, material schedules and cost estimates for Guinea projects, prepared remotely from your drawings and priced with a stated currency and date basis.
En français. Nous établissons des estimations de coûts et des états de matériaux pour des projets en Guinée, à partir de vos plans. Prestations à distance uniquement.
Guinea's construction market is centred on Conakry, with a growing minerals-driven economy and a significant volume of private residential building. Material supply is import-dependent, and the Guinean franc's movement against major currencies has a direct effect on construction budgets.
We prepare cost estimates and material schedules with the currency and rate basis stated, so exchange rate exposure is visible before the budget is committed.
What we can deliver for a project in Guinea
Bill of quantities
Measured trade by trade from your drawings, priced in Guinean franc (GNF) or issued blank for tender to local contractors.
Material schedule
Itemised quantities of blocks, cement, aggregates, roofing, finishes and services, staged so purchasing follows construction.
Cost estimate
Elemental cost plan with the rate basis, currency and date stated, and import or logistics costs shown separately.
Review of a bill prepared locally
An independent check on quantities and rates in documentation prepared by another party, before you tender or sign.
- Documents travel; site attendance does notEverything above is prepared remotely from drawings and written information.
- Currency and date basis statedExchange rate exposure is a material risk in Guinea, so estimates state the currency and date basis of every rate.
- Local professional where neededWhere a project requires on-site presence in Guinea, we will say so and not take the instruction.
Cities we receive enquiries from
Most enquiries from Guinea relate to projects in or near Conakry, Kankan, Nzérékoré, Kindia. The location matters for the estimate, because material transport and labour rates vary between regions, so tell us where the site is even though the work is prepared remotely.
What to send
Architectural drawings in PDF or DWG, structural drawings if they exist, the site location, and the standard of finish intended.
What you receive
A measured document in editable and PDF form, with assumptions listed and the rate basis stated.
Turnaround
Typically 5 to 10 working days for a bill of quantities once complete drawings are received.
Questions from Guinea
Do you attend sites in Guinea?
No. Field-based attendance is offered in Nigeria only. For Guinea we prepare documents remotely from drawings and written information, and we will say plainly when a project needs a local professional on site.
In what currency is a Guinea project estimated?
Estimates are normally prepared in Guinean franc (GNF), with the rate basis and the date of the rates stated. If you need the figure in naira, dollars or another currency for comparison, ask and we will show the conversion basis used.
Can you write the documents in French?
Deliverables can be issued in English and, where relevant, in French. State your requirement in the brief and the document will be written accordingly.
Send drawings for a Guinea project
A written fee and delivery date, normally within 24 hours. Documents can be issued in English or French.
We read everything sent to info@peterch.org. Replies go out by WhatsApp — include a working number, with country code, in your first message.