+234 805 280 6928 Request a quotation

Quantity surveying documents for projects in Liberia

Measured bills of quantities, material schedules and cost estimates for Liberia projects, prepared remotely from your drawings and priced with a stated currency and date basis.

Liberia operates substantially in United States dollars alongside the Liberian dollar, which shapes how construction is priced and how contracts are written. Material costs are heavily import-dependent, and the exchange rate therefore has a direct and visible effect on a budget.

Our Liberian work is document-based: measured BOQs and cost estimates with the currency basis and rate date stated explicitly, so that exchange rate movement is a known risk rather than a surprise.

What we can deliver for a project in Liberia

Bill of quantities

Measured trade by trade from your drawings, priced in Liberian dollar and US dollar (LRD/USD) or issued blank for tender to local contractors.

Material schedule

Itemised quantities of blocks, cement, aggregates, roofing, finishes and services, staged so purchasing follows construction.

Cost estimate

Elemental cost plan with the rate basis, currency and date stated, and import or logistics costs shown separately.

Review of a bill prepared locally

An independent check on quantities and rates in documentation prepared by another party, before you tender or sign.

  • Documents travel; site attendance does notEverything above is prepared remotely from drawings and written information.
  • Currency and date basis statedA dual-currency market makes the basis of an estimate as important as the number itself, so every rate is dated and its currency stated.
  • Local professional where neededWhere a project requires on-site presence in Liberia, we will say so and not take the instruction.

Cities we receive enquiries from

Most enquiries from Liberia relate to projects in or near Monrovia, Gbarnga, Buchanan, Harper. The location matters for the estimate, because material transport and labour rates vary between regions, so tell us where the site is even though the work is prepared remotely.

What to send

Architectural drawings in PDF or DWG, structural drawings if they exist, the site location, and the standard of finish intended.

What you receive

A measured document in editable and PDF form, with assumptions listed and the rate basis stated.

Turnaround

Typically 5 to 10 working days for a bill of quantities once complete drawings are received.

Questions from Liberia

Do you attend sites in Liberia?

No. Field-based attendance is offered in Nigeria only. For Liberia we prepare documents remotely from drawings and written information, and we will say plainly when a project needs a local professional on site.

In what currency is a Liberia project estimated?

Estimates are normally prepared in Liberian dollar and US dollar (LRD/USD), with the rate basis and the date of the rates stated. If you need the figure in naira, dollars or another currency for comparison, ask and we will show the conversion basis used.

Can you write the documents in English?

Deliverables can be issued in English and, where relevant, in French. State your requirement in the brief and the document will be written accordingly.

Send drawings for a Liberia project

A written fee and delivery date, normally within 24 hours. Documents can be issued in English or French.

We read everything sent to info@peterch.org. Replies go out by WhatsApp — include a working number, with country code, in your first message.

Call now WhatsApp